@krugerconstruction: A little drywall lift action on these 10’ ceilings at our shop • Decided to do the interior in OSB then prime and p but aint it rather then doing drywall • Stapling them up with the Senco NS20XP After we get the ceiling up the overhead doors go in and and the blown in insulation goes in the attic. Heaters can also be installed too • Then we can focus on getting the walls insulated, vapor barrier and sealed. Then board all the walls. • Using the @Crescent Tools G2 tape and chalk line 👍