Offering respect to the “code writers” and following the rules is great. But code writers are human. Like you. The code is not perfect. Always be curious. Don’t be afraid to question. 😎👍🏼
2025-03-01 16:33:36
4
jjd5533 :
I’ve always taken my gas to my sub. I only take water and uffer to main.
2025-03-02 22:17:05
0
Michael OConnor :
First point of entry, not the service…
2025-03-02 22:49:47
0
Mike Waldo10 :
if it was me, I would put a separate ground rod in because of gas
2025-03-02 18:15:43
0
BradB :
If it’s bonded at the meter, how is it not boded throughout the whole service? If it’s connected somewhere, it’s connected everywhere. Explain how I’m wrong. I have yet to have a single inspector be able to answer that question.
2025-03-02 05:11:31
0
AOFishing :
so we only bond the gas pipe at the entrance of the house..typically Gas and elec panel are on same side of house but not always..we run a #4 from clamp to main serv disconnect
2025-03-01 14:08:53
1
Guyjoe :
The gas companies in TN will not allow you to bond the gas line to the electrical panel. They want a separate ground rod.
2025-03-01 17:15:52
2
A C :
A detached building would have its own ground rods and disconnect so personally, I would bond it there.
2025-03-23 16:25:56
1
Scooter 82 :
Water and gas
2025-03-06 00:34:23
0
DavisHuff88 :
In MS we bond only if it’s CSST. I believe it’s in the IRC and ICC which is the code book local AHJs go by over NEC sometimes or at least in my area. We bond outside from service to gas pipe entering
2025-03-01 14:14:24
0
Iₙₛₚₑcₜₒᵣ DV 🧐 :
If there are things even you don't understand about why the code is the way it is, how are home inspectors like me expected to understand. I've asked electricians questions & get very obscure answers.
2025-03-15 22:06:11
0
shanethome :
Great Content!
2025-03-01 13:30:30
1
Uncle Twizz! :
So in my area the conflict in this rule is only if you use black steel pipe no bond is required. If you use CSST a bond is required. But trac pipe isn’t required to be bonded IF it’s properly installe
2025-03-01 13:23:44
0
hums.79 :
It’s AHJ. It happens everywhere. We do not bond the gas piping here. Just a thought, I had to bond an additional panel and the inspector suggested that I attach to the number 4 bond wire with an irreversible crimp in lieu of running a separate wire out to the main panel.
2025-03-28 04:23:09
0
gearratio380 :
why do they call it bonding instead of ground. it's the same thing right?
2025-03-01 14:48:33
0
SUPERLILDILL :
Neutral bar. Same with ground rods
2025-03-01 16:36:02
1
Scooter 82 :
Gas and water needs to be bonded to a ground.rod or 6 feet up to 45* or concrete frame
2025-03-06 00:38:12
0
Scooter 82 :
Thank you I have a old timer that say never bond gas
2025-03-06 00:39:16
0
Aaron Davis :
badass man
2025-03-03 04:42:51
0
FettPool :
by stating that an additional or "non-standard" (e.g., not the gnd in your 12/2), it ensures that the pipe is bonded to the svc entrance if the feeder to the sub-panel is damaged. this is an educated guess.
2025-04-20 20:53:31
0
100life00 :
You should do tictok live
2025-04-15 19:55:01
0
💨FrazierBoi💨 (GBF)🌪️⚡️ :
Dominion Electric down here grounds there own gas line. Saying we are not allowed to ground with electrical equipment. Because it mess with their electronics.
2025-03-04 06:51:56
0
JaysonXIII :
😏to building steel or water pipe
2025-03-26 22:37:16
0
charlieconover2 :
Always said that, but the inspectors will not go for it usually
2025-03-22 01:07:55
0
eco214tango :
Inspection persons are making “ two “ wrongs to make a right .!