itsmeluisc :
230.85 requires an Emergency Disc. (ED) outside. If this ED is also the Service Disc. t, the interior panel needs a 4-wire feeder. If it's only an ED, 250.25 applies, a 3-wire cable is ok.
2025-05-11 17:11:55
41
thepittsburghplug
thepittsburghplug :
Never heard of this. If there is a disconnect usually you have to use ser. Do you have a code reference?
2025-05-12 05:21:54
1
pengoasteroid
PengoAsteroid :
If someone adds a breaker in that outside panel then the outdoor 200 amp breaker becomes a main breaker and you have to change the wire inside to SER?
2025-05-11 19:50:23
0
overland88
overland88 :
In our jurisdiction it was determined if there are additional spaces for circuits it is no longer emergency disconnect only.
2025-05-11 15:21:00
4
sparky8781
Sparky8781 :
Correct me if I’m wrong but isn’t that panel inside now considered a subpanel? You have branch circuit in that enclosure outside!!
2025-05-12 01:53:08
0
kyle11222
. :
Neutral and ground should be bonded at first means of disconnect, which means outside in this case, running SEU was a code violation
2025-05-20 02:26:59
4
elcummunista
Wuan :
did we forget the conduit in the store or what??
2025-05-25 04:18:56
5
user573038109
jason :
why would the 200 amp breaker panel outside not be considered the main panel forcing you to use 4 wire,bring all bonding there and separate grounds and neutrals inside?
2025-05-12 00:17:57
7
outlaw7389
Outlaw 120/240 Volts ⚡️ :
Wouldn’t pass here,not without 4 wire going into the inside panel from the disconnect
2025-05-11 16:30:49
3
dchetwynd
Dan :
Cant do that as that meter's listing is for "Service Equipment Only." Says it on the inside sticker as well
2025-05-11 16:44:06
1
preston3013
Del Preston :
I would’ve done a survive loop in the disconnect itself would’ve looked a lot better
2025-05-13 00:29:34
0
treyroger
Trey Roger :
Make sure your dad knows how much you respect him for teaching you things cause you don’t want to realize it too late. The light in my dad’s eyes that day was worth it, just wish I would’ve told my Papa thank you for all the skills he taught me that I use now.
2025-05-12 20:51:53
1
mikey_oc
Michael OConnor :
I always install meter bases…atleast 8 space and put as many big appliances on it as I can. I guess it’s preference but I always felt like a meter bases combo is nice when replacing the service
2025-05-11 16:00:46
4
judicator2
Judicator :
so my inspectors say that can ONLY be a main disconnect until they start putting emergency disconnect stickers on it from the factory
2025-05-11 20:56:02
0
tomk068
TomK068 :
What meter/breaker combo unit is that? Is the job in PSE&G area?
2025-05-12 02:37:16
0
merlincontroltower
merlincontroltower :
Most use a meter base as the disconnect for the house .
2025-05-11 19:16:16
0
apjr8908
APJR8908 :
You con du it!
2025-05-11 16:42:00
1
hbssystem
HBS-SYSTEM :
If you were using the Canadian code that problem would have been solved from the beginning. It make sense to have a service disconnect on the outside in the event of an emergency.
2025-06-09 23:59:29
0
electricprenuer
Tony Pulvirenti :
Not required yet here in NY
2025-05-12 01:24:48
0
billycarr4
Billy Carr855 :
Where did you take your egc? To emergency disconnect or panel inside?
2025-05-12 01:27:11
0
wesleyrgriffin
wgriff34 :
But if your state admits it, you do not need it. It’s only code for the states that didn’t exempted from the NEC.
2025-05-12 11:06:00
0
el__king33
Angel :
I get that the main wire feeding the meter is made to be installed like that but something about the wire not being ran through some type of conduit doesn’t sit right with me lol
2025-05-12 20:20:37
0
eco214tango
eco214tango :
Means there’s space to add circuit breakers I would consider that a subpanel on the inside then. There are those that are made without the capability of adding circuit breakers under that then I would consider that an emergency disconnect not service equipment
2026-04-09 19:27:29
0
shitter.man
Shitter man :
Just strapping the SEU to the side of the building is so grody
2025-05-13 23:19:46
0
user10861202745011
eagle :
our utility won't use combos
2025-05-11 20:52:06
0