@baileyannette_: I LOVE SIXXXX @SIX 👑 @SIX on Broadway #fyp #foryoupage #foryou #musicaltheatre #sixthemusical

baileyannette_
baileyannette_
Open In TikTok:
Region: US
Tuesday 11 November 2025 18:24:38 GMT
449
40
0
0

Music

Download

Comments

There are no more comments for this video.
To see more videos from user @baileyannette_, please go to the Tikwm homepage.

Other Videos

THE WALL TRANSMISSION — RECOVERED REEL 033 [ ATTACK ON TITAN — UNAIRED LIVE-ACTION PILOT 1988 ] The wall was already there before they started building the set. In 1988, a production unit of nine people registered under the  name Kyojin Works — correspondence routed through a PO box in  Sapporo, no prior credits, financed by a private European investor  whose name appears in no entertainment industry record — completed  28 minutes of 16mm footage in a decommissioned cement factory  outside Hokkaido. The walls of the facility were eleven meters  high. Nobody on the crew could explain why they had been built  that way for a cement factory. The Attack on Titan pilot had no dialogue for the first ten  minutes. A child standing at the base of something too large  to fit in the frame. The camera never pulled back far enough  to show the top. The director’s production note dated March  7th 1988 reads: “we decided today not to show what is above  the frame. the actors already knew not to look up.” It aired once on a UHF channel in Hokkaido, September 3rd 1988.  Runtime: 28 minutes. The station’s log lists the slot as  occupied but carries no title, no production credit, no  advertiser code. A technician on duty that night wrote a  single note in the broadcast log: “something was wrong with  the aspect ratio. the frame was too small for what was in it.” The European investor withdrew all funding the morning after  broadcast via a fax sent at 4:52am. One sentence. No  explanation. The fax number traced back to a hotel in  Frankfurt that had no record of a guest matching the  investor’s name. Kyojin Works dissolved the following week. The cement factory was demolished in 1991. The walls took four times longer to bring down than the  demolition crew had estimated. #lostmedia #AttackOnTitan #shinjekinokyojin #aotedit #leviackerman
THE WALL TRANSMISSION — RECOVERED REEL 033 [ ATTACK ON TITAN — UNAIRED LIVE-ACTION PILOT 1988 ] The wall was already there before they started building the set. In 1988, a production unit of nine people registered under the name Kyojin Works — correspondence routed through a PO box in Sapporo, no prior credits, financed by a private European investor whose name appears in no entertainment industry record — completed 28 minutes of 16mm footage in a decommissioned cement factory outside Hokkaido. The walls of the facility were eleven meters high. Nobody on the crew could explain why they had been built that way for a cement factory. The Attack on Titan pilot had no dialogue for the first ten minutes. A child standing at the base of something too large to fit in the frame. The camera never pulled back far enough to show the top. The director’s production note dated March 7th 1988 reads: “we decided today not to show what is above the frame. the actors already knew not to look up.” It aired once on a UHF channel in Hokkaido, September 3rd 1988. Runtime: 28 minutes. The station’s log lists the slot as occupied but carries no title, no production credit, no advertiser code. A technician on duty that night wrote a single note in the broadcast log: “something was wrong with the aspect ratio. the frame was too small for what was in it.” The European investor withdrew all funding the morning after broadcast via a fax sent at 4:52am. One sentence. No explanation. The fax number traced back to a hotel in Frankfurt that had no record of a guest matching the investor’s name. Kyojin Works dissolved the following week. The cement factory was demolished in 1991. The walls took four times longer to bring down than the demolition crew had estimated. #lostmedia #AttackOnTitan #shinjekinokyojin #aotedit #leviackerman

About