last shift I had a machine "operator" fluff up something on an HMI that caused it to crash (die punch) and caused two line to stop dead in thier tracks aka.
- damages exceeded [6.2mil$]
- destroyed press
- ruined product
and
- me enging up having to add a pass code to all 54 machines and getting new out for 3 hour str8 by not management but CORPORATE.
was fun week at work
Just to add some numbers to it
- 2000 items / min on one line
-two line are feeding in to a single washer
- both line need both presses operating
and
- both line were down for 2 days...
causing large scale production to go down...
[(2000×60)×60]×39...
thats 280 800 000 products lost and a lot of damages in destroy products on the line and materials
all that is pointless I the comparison to the fact that material can be paid for time can't
2025-11-20 20:37:06
2