@dmitribuilds: How to Electrical Drawings: One Line Diagram. Sparky, let me know what I missed! #electrician #projectmanager #jobsite #constructionmanagement #construction
There is a variety of ways engineers show one line diagrams. The idea is the same though, just wanted to point this out.
2026-06-01 19:51:49
51
David Shock :
It doesn’t always start bottom left,lol, I don't know where you got that from.
2026-06-01 20:08:39
17
Hector Rivas163 :
My 3 yr old can read a 1 line.
2026-06-28 20:24:02
0
973kbnz :
Where do you Build those diagrams? Some Special software?? Autocad?
2026-06-15 15:18:56
2
Bob :
you dont "pick 2". you need to bond them all.
also ufer doesn't need to be 20' if the rebar is 20'
2026-06-02 00:25:52
5
ssnake1107 :
Yeah this single line diagram is terrible
2026-06-02 23:18:16
8
VonNaz :
We’ve always called it a single line diagram, one line diagram sounds funny lol
2026-06-01 22:13:02
7
DirtyDeen :
Spasiba dima
2026-06-02 05:31:40
4
Monica :
Wow I’ve been looking for a video like this for awhile now 😂
2026-06-03 03:00:27
3
user8641613914362 :
Guy knows ball
2026-06-01 21:41:31
3
Dayton.Oglesby :
Learned something, liked, followed. Thanks boss🫡
2026-06-03 00:04:36
1
Brian Reid :
Thats a lot more detailed than I ever got😭 oh and our engineers always called them riser diagrams
2026-06-01 00:59:50
9
LilNapkin :
all these master electricians in here 😂
2026-06-03 16:13:26
0
user3707303096885 :
Revit one lines 🤮
2026-06-04 00:19:43
1
@Frank :
Roughly 48 ka at 65 good
2026-06-03 01:21:35
1
Jason :
One correction, not all one-lines start at the bottom. Most that I’ve seen start at the top. To me it makes more sense visually because you’re going down the oneline for all the “downstream” equipment.
2026-06-04 02:34:45
6
_bananaC4k3 :
We call this riser diagram
2026-06-17 02:52:39
1
David Shock :
I do a lot of water Wastewater projects and bid even more, I've seen so many drawings in my area tgst I can tell who the electrical engineer is that Drew it within about the first 10 seconds of opening one-line diagram or details.
2026-06-02 00:53:21
3
Taddy J :
Always love seeing how they do things at places other than Australia. Same same but different 😊
2026-06-02 00:18:54
2
user850606402984 :
Thank you for sharing 🙏
2026-06-02 02:55:26
1
ninjaman J :
Very interesting to see a building SLD like this. I do mostly industrial and ours definitely look a little different. for one we always start at the top and work down. we also never "let you choose" grounding. also crazy to see so much aluminum. We are basically always copper over here, and could never get away with a table like that. but we got so much mixed derates that you can't really summarize it. we also have such varried SLDs, and can if we choose, put a LOT of details on them.
2026-06-02 03:16:48
1
Gabriel L :
65 kiac is the shorts circuir capacity of the interruptor.
2026-06-01 23:21:57
1
axiosxgapph :
Easy money. Not doing the work is fun too
2026-06-01 02:36:31
1
Matt Frydenlund :
I am relativity new. Have a question. Is that first cabinet with the meter is that also a disconnect? I notice you don’t say disconnect until talking about the aps.
2026-06-18 10:20:50
0
DE Trades :
also, not sure why we keep referring to conduit as "pipe" there no pipes in the electrical code book.
2026-06-07 12:10:18
0