@ease.engineering: Ease Engineering has successfully executed a landmark structural optimization project near Sarah Mall in Kazanchis. Initially finalized and planned as a Ground + 22 (G+22) structure, the project was vertically expanded into a Ground + 29 (G+29) tower—gaining 7 additional floors over its original design. The engineering breakthrough was achieved by Post-Tensioning (PT) technology starting from the 5th floor onward. By transitioning to PT slabs, we significantly reduced the building's overall dead load and slab thickness. This critical weight reduction allowed the existing foundation and lower columns to safely support seven extra stories. As Ethiopia’s first and premier post-tensioning specialist, Ease Engineering continues to set new benchmarks for innovative urban densification. Location: Kazanchis (Near Sarah Mall), Addis Ababa Original Plan: Ground + 22 (G+22) Final Modified Structure: Ground + 29 (G+29) (7 Floors Added) #easeengineering #posttensioning #slab
what ? it is not impossible how to edit foundation and column analyising
2026-06-02 08:51:39
19
Kas50 :
how do you get the permission from the authority???
2026-06-03 05:33:17
11
tedd concrete batching planter :
do you need concrete batching plant proffesion?
2026-07-07 04:20:07
0
Eng Mohammed :
please check the load and bearing capacity and analysis before you add floors
2026-06-02 17:28:47
6
sisay :
ፕሌት ጄቦልት አለኝ አሰሩኝ
2026-07-15 09:29:02
0
አዳ የሶሲ ባል፡፡ :
እድግ በይ
2026-07-13 02:02:09
0
Abdeta Kasso :
Almost this building have not factor of safety
2026-06-02 19:16:24
6
kgga225 :
kkkkkkkkk this guys is so funny!! post tensioning :it allows withstand tension and bending force in slab! how about footing pad which is designed before???
2026-06-04 08:36:56
3
melaku :
Post Tensioning reduces dead load on upper floors but doesn't fix what's already built below foundation, columns and shear walls all need re-evaluation. Hope a licensed structural engineer is leading this, not just the contractor 😳
2026-06-04 19:20:57
1
God is good :
I really appreciate what you are doing. But people needs clarification while posting such big ideas.
Post Tension considered while the building was 5th floor. post tension applied to floor slab so the load reductions is for the remaining 17 floors. Let's consider you have have reduced the floor thickness by 4cm. Therefore, you may add two or three floor unless the initial design was over designed.
2026-06-03 10:51:56
5
Teddy Best289 :
it's not only gravity load i doubt on the seismic performance with regard to hight and other parameters,live load i am sure the post tension only reduce the self weight it raises a question ??????
2026-06-02 19:29:04
1
temu fish :
even the circular column diameter or circumference is seems smaller to carry out as i see plus span distance for this buldg??????
2026-06-03 20:52:54
2
ephyi :
7 additional floor=subtracted conventional slab.Almost no change in foundation.
2026-06-02 14:29:08
2
Sam_D :
wtb the foundation🤔🤔
2026-06-02 10:10:56
1
@musa arsii Asala ✓✓✓✓ :
sira ale
2026-06-02 14:20:13
1
wang du chung chang :
betraka
2026-06-02 14:53:03
1
yonas hailu :
whaterever thecnology u used; how to increase 7 floor without edit foundation. have check your your analysis
2026-06-03 04:09:16
1
GEchi :
ትችያለሽ እህት
2026-06-26 12:29:49
0
Tile23 :
confusing! How could u adjust the additional load?
2026-07-02 04:08:30
0
Yoni :
አታካብጂ redesign ማረግ ይቻላል
2026-07-30 23:16:39
0
soccer fansss :
@soccer fansss:what measurement you take for the effect of lateral pressure?like wind pressure
2026-07-06 15:13:21
0
Eng.Yasin-ياسين✌️ :
Jacketing 🤔
2026-07-06 05:01:12
0
seife :
how is that possible?
2026-07-05 18:30:34
0
ETSH :
foundation and Column????😭😭
2026-06-02 15:23:18