@tysonomomultimedia: The Lincoln Memorial Reflecting Pool in Washington, D.C. has shown visible algae growth in sections just days after reopening following a major $13–$15 million renovation. Today, workers were actively cleaning and treating the water, while the system stabilizes after being drained, resealed, and refilled. To be fair, the algae is appearing in shallow, sun-exposed areas as circulation and water chemistry continue to adjust post-construction. #WashingtonDC #ReflectingPool #LincolnMemorial #News #Infrastructure