@formulatattoo: And this is why they’re tattoo artists 😅

Formula Tattoo
Formula Tattoo
Open In TikTok:
Region: US
Monday 15 June 2026 23:19:04 GMT
6294
235
6
7

Music

Download

Comments

lraage
lynette_raage :
Funny I'm an interior designer at an architecture firm and I would be a tattoo artist if I wasn't a designer… literally joked about it in school too 😆
2026-09-25 14:39:55
1
.procraastinate
Nate :
I wanna get tatted
2026-06-16 17:00:18
1
callmekelly83
Kelly Rodriguez :
😁😁😁
2026-06-16 02:06:33
1
mzaraaaaay
mzaraaaaay :
😂😂😂😂😂😂😂😂😂
2026-06-16 15:03:57
1
To see more videos from user @formulatattoo, please go to the Tikwm homepage.

Other Videos

Cable-Stayed Bridge Construction from Start to Finish | Full Engineering Process Watch the complete construction journey of a modern A-shaped pylon cable-stayed bridge—from site preparation and deep foundations to the final illuminated bridge carrying traffic. This construction visualization covers the major stages of the project, including site surveying and clearing, foundation setting-out, deep excavation, bored-pile drilling, reinforcement cage installation, pile concreting, pile-cap reinforcement and casting. The construction then progresses to the massive reinforced-concrete A-shaped pylons, including rebar erection, formwork, concrete casting, lower crossbeam construction, high-level pylon work and removal of temporary access systems. The bridge superstructure is developed through precast concrete box-girder deck segment transportation, heavy crane lifting and installation, progressive deck construction, stay-cable installation, cable anchoring and hydraulic stressing until the complete cable-stayed bridge structure is formed. Final works include the central road median, asphalt paving, modern street-light installation, protective spray painting of the pylons, stay-cable finishing, automated road markings and final site finishing. The video concludes with the completed bridge illuminated at night, vehicles traveling in opposite directions across the separated carriageways, and ships navigating naturally along the river. This AI-assisted engineering visualization is created for educational, documentary and visual demonstration purposes, showing the general construction sequence of a large cable-stayed bridge from foundation to completion.
Cable-Stayed Bridge Construction from Start to Finish | Full Engineering Process Watch the complete construction journey of a modern A-shaped pylon cable-stayed bridge—from site preparation and deep foundations to the final illuminated bridge carrying traffic. This construction visualization covers the major stages of the project, including site surveying and clearing, foundation setting-out, deep excavation, bored-pile drilling, reinforcement cage installation, pile concreting, pile-cap reinforcement and casting. The construction then progresses to the massive reinforced-concrete A-shaped pylons, including rebar erection, formwork, concrete casting, lower crossbeam construction, high-level pylon work and removal of temporary access systems. The bridge superstructure is developed through precast concrete box-girder deck segment transportation, heavy crane lifting and installation, progressive deck construction, stay-cable installation, cable anchoring and hydraulic stressing until the complete cable-stayed bridge structure is formed. Final works include the central road median, asphalt paving, modern street-light installation, protective spray painting of the pylons, stay-cable finishing, automated road markings and final site finishing. The video concludes with the completed bridge illuminated at night, vehicles traveling in opposite directions across the separated carriageways, and ships navigating naturally along the river. This AI-assisted engineering visualization is created for educational, documentary and visual demonstration purposes, showing the general construction sequence of a large cable-stayed bridge from foundation to completion.

About