@awesomeframers: Calling all structural engineers! I’ve got a framing puzzle for you, and we’re trying to optimize for the next job. Here are the specs on this wall: 44-foot-long balloon framed wall to the roof @pwt_ewp LVL studs A 9.5” continuous LVL ledger running 28-29 feet, screwed into every stud with @Simpson Strong-Tie SDWS Timber Screws (per engineer) With that continuous ledger acting as a band, do we actually need the header in that 6020 window? 🤔 I have my doubts, but hey... I’m just the framer. Drop your knowledge in the comments: How would you analyze this load path? (And don’t worry, no liability here—just shop talk!) 👇 #Framing #Carpentry #StructuralEngineering #ConstructionLife #huberpartner
Probably be OK. There are variables however you have the load from the wall itself. Is the wall going to the roof or you have a bearing trust above that to take the load off the wall?
2026-06-17 17:47:29
1
cribber :
yes you need the header to hold the roof load.
2026-06-23 19:32:51
1
Vampire Alberta :
Who would design this. It's a fire risk.
2026-06-16 19:15:36
4
davez :
exterior wall what a maroon
2026-06-17 02:44:39
1
Franks_Design :
if the wall has 2nd floor ceiling and foof load then yes
2026-06-16 20:42:18
1
David Schonacher :
Yes. Ledger takes load to the wall and header. Wall doesn’t load ledger since ledger not as stiff as deformation in studs and header. - Florida PE
2026-06-18 02:04:46
0
brianfrustaglio :
Not enough info
2026-06-17 03:35:45
1
Gator 83 :
short answer is yes
2026-06-16 19:21:19
5
StantheKerriShannonfan🇨🇦 :
No definitely even when framing light gauge, interior steel stud.You must have a box beam above over forty inches if you're under forty inches , you don't need it
2026-06-20 15:12:41
0
CJ :
Yep, just put the header in
2026-06-16 19:13:40
1
user9699074012481 :
If that is a gable end above then no you do not need the header
2026-06-21 19:28:56
0
Brent :
depends on the roof load
2026-06-30 00:12:29
0
joel vink :
Yes, roof load and floor load are both on it
2026-06-16 22:07:21
2
Babe Patterson :
only one question. does the roof load transfer around the window?
2026-06-17 02:17:55
3
James :
Yes, to support the studs above the window. But why was it balloon framed?
2026-06-17 14:28:36
0
austingipperich12 :
im not an engineer, but I am a framer. I do think its needed. the load path from the joist goes to the ledger, then down the studs. how i see it, the load path is essentially the same as if it was bearing directly on top the window, since the weight of each joist follows the stud down and over the window. love your content, have a great day!
2026-06-16 17:26:13
3
Astolfo CESENA Resen :
Huh
2026-06-16 13:53:09
0
Sean :
YES
2026-06-21 15:49:46
0
clint :
no.
2026-07-12 16:20:06
0
Robert Marynow :
You don’t have stamped plans
2026-06-20 10:52:36
0
charliemurray732 :
Had that been a double LVL you would have been OK.
2026-07-02 17:39:22
0
gjdewald :
I'm not an engineer. I'm not even a lowly builder. Since the ledger is holding up the floor joists, why would the wall below need a header to carry the load of the floor joists? The header is a waste of time, materials, and money.
2026-06-18 01:39:56
0
Conservative emigrant :
In NC you need 3 kings on each side if the window is 6’
2026-06-18 01:26:53
0
HeAth :
The header is in there. Insulation is just on the front side covering up the 2x header
2026-06-17 19:46:39
0
Astolfo CESENA Resen :
I would also agree with you
2026-06-16 13:53:32
0
To see more videos from user @awesomeframers, please go to the Tikwm