Engineer don cash out even pilling in swamp area is not 35m, shey na only waterproof cement dem use ni lol, cement is 12,300 highest 50bags=615,000
1,500 blocks 9'inch @ 900naira each= 1,350,000. iron for short pillars and workmanship 850,000 digging pilling and casting 1,000,000 sharp sand 200,000 granite 500,000 making total of 6,015,000 highest 7m including German floor, so wetin you take 35m do awon eleyi ma tun lowo yato, with the 7m engineer sef don cash out, Carpenter will bring wood for casting and rove his wood back highest 200k for Carpenter, maybe he wanted to write 3.5m😂