he failed to mention that that was a very old installation and that was probably the 1st maintenance after a long time of services . installers should encourage maintenance once a yr instead of carry out "upgrations"
2026-07-04 23:19:56
0
SOLAR INSTALLER IN IJEBU-ODE :
you did a upgration 🙄
2026-07-04 09:00:14
8
sharp_punter :
the installation lacked regular maintenance check
2026-07-04 07:58:12
3
owas w enterprises, ELECTRONIC :
what year was this solar installation done,if it was more than 3 years, please don't blame the installer, because 3 year back most installer join wires without using mc4
2026-07-03 13:40:41
5
BAM_TECHENG22 :
when was MC4 introduced??? I believed this is a 2-3yrs job. im not siding bad jobs oo but we should all know better. show us ur work of two yrs ago where u use MC4.
2026-07-04 09:20:36
4
WattlessEnergy :
if you don't have mc4 connector, you may join cable(you may use required cable jointer) firmly, but before joining, you cut a coverable length of 20/25mm square pvc with the joining part, then insert the pvc after proper insulation and fill the pipe with silicon gum.
2026-07-04 22:20:12
2
JOFA Solar :
Did you use MC4 5 years ago????. That is old installation
2026-07-04 10:35:51
2
Bammy-Oz Engineering :
Oga do your work and go, when did Mc4 come out ask the client the year the installation was done.
2026-07-04 07:24:31
1
K&A Alabtech Computers Ltd :
Mr Professional.. We did the upgration…😂😂😂😂
2026-07-04 15:59:56
2
Godspower Electric ⚡ :
u did a upgration
2026-07-04 14:21:07
1
Danny 🫵🏼 :
you did what? 😂😮💨
2026-07-04 22:12:00
0
Daniel'smind👿😈👿😈👹 :
omo you did upgration
2026-07-04 22:52:09
1
miracle.eth :
omo and na wetin I do when I install my solar myself be this I cut the mc4 connector but I cover each of the wires with tape properly and been using it for 3 months now without issue
2026-07-04 18:46:08
0
Nduks :
the only problem I'm seeing here is that the engineer didn't insulate the cable properly
it not a matter of using mc4 or not
he was managing is insulation which is wrong
2026-07-04 13:59:47
0
OYINDA-BOYLE :
Baba no know what to say… I’m not supporting bad job but if the Engineer used a better tape and taped multiple times this won’t happen. MC4 was recently introduced, and this job looks like a 2-5 years job.
2026-07-04 11:55:06
1
country Man :
Although you are not also a qualified engineer, but you made some valid points.
2026-07-04 19:12:03
1
Technology Company :
terrible Installation seen so far ,
2026-07-04 08:31:24
1
SOLAR/SMART HOME COMPANY IN PH :
Mr upgradation 😂
2026-07-04 23:23:03
0
MR BIG MAN™ :
you did a upgration?😭
2026-07-04 20:15:54
0
djdonkazzy :
I don’t think he uses panel rack self
2026-07-04 06:14:10
0