@tanphan1105: 120 m³/day Package STP | MBBR Wastewater Treatment Tank D3.0m Tank integrated biological wastewater treatment: Septic & Anaerobic Treatment, Equalization, Anoxic Denitrification, MBBR, Lamella Clarification, and UV + Chlorine Disinfection. Industrial 3D CAD model for process visualization, engineering design, and BIM coordination. Designed by WT3D Studio. #WastewaterTreatment #MBBR #WaterEngineering #creatorsearchinsights

WaterTreatment3D
WaterTreatment3D
Open In TikTok:
Region: VN
Wednesday 05 August 2026 13:08:57 GMT
1307
50
7
3

Music

Download

Comments

tanphan1105
WaterTreatment3D :
120 m³/day STP | Tank Lifting, Positioning & Anchoring Installation progress of the 120 m³/day Sewage Treatment Plant, with three treatment tanks successfully lifted, positioned, and anchored on site. 📍 Installation Work: • Crane lifting and rigging • Controlled tank lowering • Tank positioning and alignment • Three-tank installation completed • Tank anchoring and fixing • Final installation preparation The tanks are securely anchored according to the planned site layout, preparing the system for the next stage of piping, equipment, and process installation. #WastewaterTreatment #STP #FRPTank #TankInstallation #WaterEngineering
2026-08-05 14:40:44
1
longsoardiffuser
Luna :
Hi Manufacturer of aerators passing by, full range of wastewater aeration equipment
2026-08-30 13:15:31
0
lmcfiltrationvn
LMC FILTRATION VN :
công ty của chúng tôi có nhận gia công bồn MBBR chất liệu nhựa PP thay thế composite. giá thành tốt độ bền rất cao. chi phí thấp hơn
2026-08-06 04:26:51
1
yuesuivn
Thiết bị môi trường Việt Tuệ :
Viet Tue specializes in the research, design, manufacturing, installation, and technical services of environmental equipment and solutions. Our factory is located in Nam Tan Uyen, Binh Duong, Vietnam. We provide comprehensive solutions for wastewater, exhaust gas, dust, and odor treatment, including DAF, MBR, RO, UASB, MVR, bag filters, cyclones, activated carbon adsorption, RTO, and more. Quality First – Reliability as Our Foundation – Customers at the Center. 📲 Zalo: 0332708717
2026-08-08 01:59:44
1
tanphan1105
WaterTreatment3D :
120 m³/day STP | From P&ID to 3D Design From process design to a complete 3D wastewater treatment system. 📐 Engineering Workflow: • 120 m³/day STP process design • P&ID development • Equipment & instrumentation layout • Piping and valve arrangement • 3D tank and equipment modeling • Full system coordination From P&ID to 3D CAD, transforming the wastewater treatment process into a practical and coordinated engineering model. Designed by WT3D Studio. #WastewaterTreatment #STP #PAndID #3DCAD #ProcessEngineering
2026-08-05 13:52:37
0
tanphan1105
WaterTreatment3D :
2026-08-05 13:57:27
1