Damn lucky no one was seriously hurt. Next is finding the fellow who built the shoring scaffolding or the engineer who designed it. No short cuts in that work.
2026-08-25 00:43:50
1
Isaías López :
Shoring Foreman, hell, the whole shoring crew getting fired! This is what happens when the foreman, the general foreman, the superintendent and the quality control person doesn't walk the job before each pour along with the General contractor walking it and having a quality control sign off sheet. To me it looks like they didn't brace the shore post every so often with a square coral bracing and the post slid with the weight and vibrator. Carpenter better throw a CJ all around that perimeter of the bust so the rest of the deck can pour and just fix that shoring. I didn't see any tension cables so they're lucky about that
2026-08-20 00:13:35
24
rodas forever :
No critico por que a cualquiera nos puede suceder 😢😢😢
2026-08-20 21:22:02
215
Israel B L :
En esos casos quienes quedan sin trabajo ❓🤔
2026-08-22 11:12:31
13
Outro corte :
Quien se hace responsable en esos casos?
2026-08-22 18:36:21
5
RubinRG :
seguro se confiaron y colocaron los espacios de puntal muy largos
2026-08-21 18:55:29
225
LFO100% :
Cuando pasa eso no es culpa de Los cementeros
2026-08-20 14:39:58
25
edwin aldana :
q paso mani
2026-08-20 18:18:46
1
javi_Romero :
Para que sacan la ofrenda antes de tiemo hubieran dejado ahí al chalán 🤣🤣🤣
2026-08-20 14:09:26
66
isibay :
menos mal paso aora se imaginan después que ya este avitado
2026-08-19 22:25:16
6
teofilo0809 :
ESO NO ES PARA RISA HUBO UNA FALLA QUE DIOS LOS AYUDE
2026-08-23 13:31:16
7
Alan🇲🇽 :
cuando pasan estos casos q hacen con el material?
2026-08-21 18:53:53
5
Felix Ayal :
Ese es el ultimo cheque para muchos.
2026-08-20 02:00:06
8
abel González :
la responsabilidad es de los obreros me imagino que los andamios mal puestos los puntales
2026-08-20 22:18:04
5
Daniel lopez :
Eso pasa por no poner refuerzos abajo
2026-08-21 18:49:21
12
Duvie LiveWire :
This happens because of the rush rush for concrete all these shell guys that’s
2026-08-19 22:18:47
104
Cheeky_704 :
This was on Australian Ave in west palm beach, I was the safety guy that had to deal with osha for the next two weeks. This was scaffolding equipment failure manufacturer defect
2026-08-21 12:57:47
8