@world.of.engineer97: #🛠️ This week, I attended a site physical reception of a skid-mounted jockey pump package designed in accordance with #NFPA20 specifications. This physical reception took place to ensure that the equipment had been delivered correctly, completely, and without any shipping damage. ​The main steps were: ​Document verification (before starting the physical reception): ​Recheck the Packing List, Datasheet, GA Drawing and shipping documents. This step is particularly important if you have been working on several projects simultaneously. ​Packaging inspection: ​Look for damaged crates, impacts. Take photos before opening if damage is suspected. ​Unpacking and visual inspection: ​Inspect the equipment for cracks, deformation, paint damage and surface damage. ​Equipment identification: ​You need to verify the Tag Number, Serial Number, Model, Manufacturer and Nameplate of each pump and driver in accordance with the approved documents. ​Accessories and spare parts verification: ​You need to confirm that all instruments and spare parts components are received in accordance with the approved packaging list. ​Dimensional inspection: ​You need to check nozzle orientations with the approved GA drawing and detailed drawings. ​Preservation and storage check: ​Verify protective covers, lubrication and compliance with the vendor's storage specifications and requirements. ​Final receiving report: ​Complete the Receiving Inspection Report before moving the equipment to storage or installation...

world of engineering
world of engineering
Open In TikTok:
Region: TZ
Friday 04 September 2026 05:56:11 GMT
2998
196
3
1

Music

Download

Comments

shivasubba31
Shiva Subba The Capricorn :
Fire hydrants?
2026-09-04 06:06:38
0
frank.feng68
Frank feng :
🥰🥰
2026-09-05 00:15:40
1
murat.kartambay
Мурат :
👍👍👍
2026-09-04 06:00:06
0
To see more videos from user @world.of.engineer97, please go to the Tikwm homepage.

Other Videos


About