@ashraf_dibo16: ازاي تعمل فيديو عقار مميز بال Ai هسبلكم البرومبت ولينك المرقع في اول تعليق

ashraf_dibo16
ashraf_dibo16
Open In TikTok:
Region: EG
Tuesday 08 September 2026 20:10:22 GMT
11020
485
11
105

Music

Download

Comments

ashraf_dibo16
ashraf_dibo16 :
برومبت الفيديو Create ONE continuous 10-second vertical 9:16 photorealistic FIRST-PERSON POV construction sequence. Sunny construction site, clean blue sky, realistic daylight, 14mm wide-angle. Exactly TWO masculine hands wearing fitted MATTE-BLACK LEATHER GLOVES throughout; same hands, same site, same building. CORE RULE: GESTURE → COMPONENT MOVES → ROTATES → ALIGNS → LOCKS → NEXT GESTURE. No chaos; every part reacts directly to the hands. 0.0-0.8s: EMPTY FOUNDATION. No building yet. Steel columns, beams, slabs, blue glass, white façade modules and roof parts are visibly stored around the site. Right hand points at ONE horizontal steel column. 0.8-1.5s: COLUMN. Right index finger flicks upward → column rapidly rises. Wrist rotates 90° → column rotates vertical. Pinch → precise alignment. Finger snap → column drops into foundation with a heavy CLACK and stays fixed. 1.5-2.3s: BEAM. Right hand flicks ONE beam upward. Lateral swipe redirects it toward the column. Wrist rotation turns it horizontal. Pinch aligns it. Snap → beam mechanically LOCKS. 2.3-3.1s: TWO BEAMS. Index flick → first beam rises. Middle-finger flick → second beam rises. Left hand redirects and rotates both separately. Two pinches → SNAP → SNAP. Structural frame begins growing. 3.1-4.0s: CONCRETE SLAB. Right finger flicks ONE massive slab upward toward POV. Left OPEN PALM stops it close to camera. Wrist rotation levels it. Both hands push forward. Pinch aligns. Downward gesture → slab SLAMS onto structure with dust and subtle camera recoil. 4.0-5.2s: STRUCTURE GROWS. Hands speed up. Columns and beams move ONE AFTER ANOTHER: FLICK → RISE → ROTATE → ALIGN → SNAP. Floors assemble progressively from bottom to top. Installed components never move again. 5.2-6.5s: CONDUCTOR MODE. Both black-gloved hands work rapidly. Finger flicks raise beams, columns and slabs. Wrist turns rotate them. Swipes redirect them. Pinches align them. Snaps mechanically lock them. Building structure becomes almost complete. 6.5-7.3s: FREEZE. Both open palms rise → all remaining parts STOP in mid-air. Right finger adjusts one beam. Left pinch aligns another support. Hands close slightly → components continue and SNAP into fi
2026-09-08 20:12:03
1
esraahussien5
Esraa Hussien :
عظمه يقلبي♥️♥️🔥
2026-09-09 10:42:34
0
zizo_975
Ziad Ashraf :
اخويا نينجا
2026-09-08 23:10:40
0
abdelrhm018
HUE7 :
برومت الصورة بقا
2026-09-08 22:29:48
0
ashraf_dibo16
ashraf_dibo16 :
لينك الموقع https://www.dola.com/chat/38417027020982033 برومبت الصورة Use the attached reference image as the EXACT final destination frame of the project. Create a cinematic architectural construction storyboard contact sheet showing the complete transformation from an empty construction site into the exact finished building shown in the reference image. IMPORTANT: The final building, architecture, proportions, façade design, materials, colors, windows, doors, signage, surrounding environment and camera perspective must match the reference image exactly. Create ONE storyboard sheet containing 12 cinematic frames arranged in a 3×4 grid. The sequence must visually tell the construction story from beginning to end: 01 — Empty construction site / ground preparation. 02 — Foundation elements and reinforcement bars begin appearing. 03 — Concrete columns and structural elements rise from the ground. 04 — Steel beams and floor slabs are assembled. 05 — The main concrete structural frame rapidly develops. 06 — Multiple floors and staircases are constructed. 07 — Exterior walls and major architectural volumes begin forming. 08 — The distinctive façade elements and wooden/slatted details appear. 09 — The main entrance/front façade is constructed. 10 — Glass windows, doors and exterior finishing materials are installed. 11 — Landscaping, pavement, lighting and surrounding details are completed. 12 — FINAL FRAME: the fully completed building, matching the attached reference image EXACTLY. VISUAL CONCEPT: A person is controlling the construction using their hands, as if manipulating the building with advanced telekinetic / futuristic architectural control. Show the person's forearms and hands in the foreground in every relevant frame. The hands should make natural controlling gestures such as pointing, pulling, pushing, spreading fingers and bringing the hands together. Construction elements should respond directly to the hand movements: - columns rise when the hand lifts - beams fly into position when the hand guides them - concrete slabs assemble when the hands move together - façade panels slide into place - glass panels fly toward the building and lock into
2026-09-08 20:11:25
0
esraahussien5
Esraa Hussien :
🔥🔥🔥🔥🔥
2026-09-09 10:42:27
0
esraahussien5
Esraa Hussien :
♥️♥️♥️
2026-09-09 10:42:21
0
kahrabaq
𝘌𝘯𝘨. 𝘔𝘰𝘩𝘢𝘮𝘦𝘥 ⌬ :
♥️♥️♥️
2026-09-09 03:25:16
0
zeidazoz
زياد الزوز👑 :
♥️♥️♥️
2026-09-09 00:26:41
0
abdo68291
عبدو :
❤️❤️❤️
2026-09-08 21:04:29
1
gamall.medhat
Gamal Medhat :
🤩
2026-09-10 06:27:47
0
To see more videos from user @ashraf_dibo16, please go to the Tikwm homepage.

Other Videos


About