@prince.joshua616: Work is progressing steadily on the 160kVA hybrid solar power installation. Current Progress: ✅ 2 × 80kVA Deye Hybrid Inverters installed and configured in parallel ✅ 27 × Deye BOS-B-PACK16-A3 battery modules installed and integrated ✅ 256 Solar PV panels installed on the carport structure ✅ PV mounting and array installation progressing ✅ DC and AC cabling and system integration ongoing ✅ System configuration, testing, and commissioning preparations underway The project is taking shape with focus on proper installation, clean cable management, safe equipment integration, and reliable system performance. We remain committed to delivering a professionally executed system from installation through final commissioning. One stage at a time. One system at a time. Building reliable power solutions. ⚡☀️🔋