when it's wrong , is the surveyor but when is good, it's the engineer.
2026-10-03 19:59:29
18
Macri :
level were set up wrong no communication Engineers And Surveyor
2026-10-04 09:08:15
0
CREEN :
1. using different method of setting out
2. using different ways in both side to find accurate position
3. using different data eg one using tarif11 and one using arc90 to calculate and computing coordinates
4. using of 2 different instruments
2026-10-04 12:42:35
0
Oyewole Abideen alabi :
the major cause should be miscalculation of sloop, and isn't common because in bridge work the surveyor mostly picked points of each segment called as made before final casting should be approved. due to as made points the deviations and slope will be noticed and the correction will be made before the casting.
2026-10-03 19:10:04
2
Thezy :
because they didn't give me the contract
2026-10-03 17:48:26
0
Cìtízéñ✨ :
stop the work immediately and find the cause
2026-10-03 17:12:13
0
LaicheeKang :
they'v should do the checking on watch sides before the problems araised, and the SURVEYOR should found it in the first place
2026-10-03 22:54:14
1
Wum_pini🇺🇸 :
Leveling
2026-10-03 21:18:13
1
silva256.com :
Wrong Open Traversing
2026-10-03 18:21:10
0
Blaque Dx :
😂😂
2026-10-03 17:05:54
0
DĪMÄ_ÑÏØR :
civil engineer claiming they can do surveyor jobs that's what happens here
2026-10-04 07:12:54
2
To see more videos from user @masteredgeacademy, please go to the Tikwm
homepage.