Yeah all you have to do is wait for it to fully cure, along with all that in your mixer... Brilliant
2026-10-27 03:23:20
19
Joeyfromthearea :
Well you have already poured the concrete what’s the point?
2026-10-27 12:25:59
7
Scasni :
What you are doing is not plumb. The concrete is being cast into cubes incorrectly, and it must not be vibrated.
2026-10-28 17:44:26
0
Ramazan G. :
Bizimkiler yarım m3 betonu numune uğruna heder ediyor
2026-10-28 16:45:46
0
Hai NB :
Nguyên bột này thì nhe răng
2026-10-28 14:51:11
0
sam Sam :
وكي تلقاو لبيطون ناقص تريبو دار؟
2026-10-28 20:18:52
0
Ayman&Louise :
مرفوضة يا معلم
2026-10-27 13:47:45
1
Suoh尊 :
都灌進去了能怎辦,打掉嗎
2026-10-28 13:13:50
1
lori :
🥰🥰🥰
2026-10-26 21:49:24
1
wak :
😂😂😂
2026-10-27 13:27:23
0
Issaka Savadogo :
🥰🥰🥰
2026-10-26 20:10:27
0
Serkan KARABIYIK :
definitely not like that. 😂😂
ASTM C172 ("Standard Practice for Sampling Freshly Mixed Concrete")
1. Sample Size: The composite sample must be at least 1 cubic foot (0.03 m³) in volume.
2.Collection Method: Pass a receptacle completely through the discharge stream or completely divert the discharge stream into a sample container. The container must be dampened before use.
3.Number of Layers: For a standard 150 mm cube, fill the mold in 3 equal layers (each roughly 50 mm thick).
4.Releasing Entrapped Air (Tapping): After rodding each distinct layer, use a rubber mallet or raw-hide hammer to tap the external sides of the mold 10 to 15 times.
5.Finishing the Surface: Once the final layer has been rodded and the mold tapped, strike off the excess concrete flush with the top lip of the mold using the tamping rod or a steel float in a sawing motion. Trowel the top completely smooth.
👍
2026-10-28 19:27:31
0