@prosperx7official: On 21 June 2001, BHP Iron Ore assembled what remains one of the most impressive engineering feats in rail history. A single freight train measuring 7.353 kilometres long and consisting of 682 ore wagons was powered by eight General Electric diesel-electric locomotives. The massive consist travelled 275 kilometres from the Newman and Yandi mines to Port Hedland in Western Australia. The train weighed an extraordinary 99,732 tonnes and rode on 5,648 wheels. It was not only the longest but also the heaviest train ever recorded at the time. The locomotives were spaced roughly a kilometre apart and controlled by a single driver using a distributed power system that allowed coordinated acceleration and braking along the entire length. #australian #trains #worldrecord