@studsandstudies: The drawings don't match existing conditions? Congratulations, you've unlocked another RFI #constructionmanagement #constructionsite #construction #constructionworker #architect

MRTConstruction
MRTConstruction
Open In TikTok:
Region: US
Monday 09 November 2026 23:51:10 GMT
32663
781
32
70

Music

Download

Comments

jesse.james.acost
jesusacosta73 :
We got a bunch of pens in the office where I work
2026-11-12 00:48:11
2
electrokindle
Ronald Short :
Architects response time to an RFI 4-8 weeks. If submitted correctly 😡
2026-11-10 09:33:15
14
rathku0
rathku0 :
And the GC says move it 8 times and write a ticket.
2026-11-10 22:16:30
27
risweari
user7771754181124 :
Three weeks later, no response
2026-11-12 01:04:44
2
gonzo_1972
Gonzo :
My RFI will have the answers just need Architect or Structural Engineer to give directives
2026-11-11 22:54:48
1
big_mike_1965
BigPapa65❌ :
I heard engineers fly really good.
2026-11-11 22:48:07
0
bootleg699
bootleg :
And then the GC rejects the change order
2026-11-11 18:51:01
0
bch4597
bch :
I just don’t understand why EVERY job has to be this way. Sometimes I see an open window and wonder if I can fly lol
2026-11-11 20:42:20
0
mc_reign09
Reign :
And the PE is posting TikTok’s …
2026-11-11 08:34:55
0
liamaitken78
liamaitken78 :
It depends on what the difference between the field and the plans are. All plans say you must install per code so if the drawings are against code, you ignore them. Also, as a master plumber, I once worked for said “the plans are just a suggestion” if everybody did everything strictly to plans, they’d be no need for as built drawings.
2026-11-10 16:08:42
4
user45494180690740
Brombear :
and that my dear friends is why you employ a professional construction/site manager. he/she will resolve most problems in a blink of an eye without any protocol. 😁
2026-11-11 16:41:07
1
forthrightfun
Angela :
And here comes the Project Manger..... 😂😂😂😂
2026-11-10 03:10:40
2
rowe5225
Rowe5225 :
Just fix and tell them to put it in the asbuilts
2026-11-10 22:22:52
1
bill_leys_deck_inspector
Leys Waterproofing Consultants :
and the architect will take 6 weeks to respond
2026-11-11 00:00:38
2
peterpense
peterpense :
Auditorium. Clouds installation. Built one with the highest sound quality in the world. A guy came and tested it. Westfield High school auditorium.
2026-11-10 21:01:10
1
wussupfool
Critical Meltdown :
It was due to a glitch 👍
2026-11-11 18:33:29
0
user6154740075287
kevin :
No no no got with the black and white
2026-11-10 02:45:31
0
douglask1967
DouglasK1967 :
It all looks good on paper😂😂😂😂
2026-11-11 08:09:59
0
pieguy872
pieguy :
Trust the men in the field
2026-11-10 23:27:32
0
jackygetz
jackygetz :
But hurry up
2026-11-10 18:24:38
0
yahiralva766
yahiralva766 :
truth
2026-11-12 01:31:38
0
maddog671967
Richard :
Yep, at the same time they yelling get the job done
2026-11-10 20:33:42
0
sviatzhuk
sviat zhuk :
project is done before you get a response.
2026-11-11 01:28:08
0
jackygetz
jackygetz :
Typical
2026-11-10 18:24:28
0
notplayingnomore
Albatross Apparel :
You all probably didn’t have someone that can read drawings 😂
2026-11-11 00:17:58
0