nicholas chin :
Nothing in this video is showing the defect. You know, what happened is that I think they are doing the concreteing. Somehow, very strangely, the concrete failed to ah reach the ceiling. I think it's a top-down construction. They just failed to pressure grout it. They, sorry, not pressure grout. They just failed to ensure that the concrete has been filled up properly. They don't ah clump together, stagnate down there, and leave the rebar exposed. So there will be issues like probably ah. Pockets of unfilled concrete when they remove the formwork. Maybe I, I think it's a top-down construction. Otherwise, they, they, they don't fill the column to the ceiling. They will construct the column first, then construct other structures. So I think it's a top-down construction. They just simply fail to do that. And the remedy is to. Remove the defective concrete, check and sample the existing column for its concrete ah ah consistency. Check and sample the concrete ah interior to ensure consistency. There is no ah pockets of voids inside. And if everything is in order, then fill the concrete top all those patches of holes ah with non shrink high strength grout. But before that, they need to test the concrete for its quality first. Whether it reached a certain compressive strength.
2026-11-10 13:09:26