I’d say do a wood deck along the back, I think it would be sick and you only really need the Crete for working on
2026-11-22 16:24:15
0
Cass :
I think the wood paneling in the back is a good idea
2026-11-21 21:49:20
0
Redimixdriva :
5 yard split. Simple.
2026-11-11 14:47:26
8
BrazenForger :
Are you planning on putting a lift in?
2026-11-11 14:22:33
1
SVT_bogey :
Concrete guy and as well as car guy. Do not go less than 4”. Do the 8 yards in the back and wait till you need another 8 yard pour around the shop. Make sure when you’re calculating this you’re also factoring in 10% over just incase. Plan for the future. I saw you say no car lift but if there’s ever a chance for that do the concrete for that now lol.
2026-11-11 15:30:54
8
Big Red :
Split the pad in half order 5 yards per truck or will they still charge you a fee
2026-11-11 13:25:47
1
coupolacameraman :
No car lift? Need at least 6” pad under the legs
2026-11-12 13:21:57
3
Travis :
Can you find a vendor near you that does short load trailers you haul yourself to make up the extra 2 yards?
2026-11-11 20:33:29
0
Rick Noga :
What company charges small load charge when you’re getting more than one truck, concrete company I worked for didn’t
2026-11-11 16:04:20
0
Jasko76 :
Pour it all, I don’t k no kw your area, but here I pay for the delivery, but they don’t ding you for a second lesser volume truck. Maybe get two 4 yard loads. Whatever you decide, even if it means paying extra for the delivery, POUR IT ALL NOW. You will not regret it
2026-11-11 15:25:10
0
that93_2500.chevy :
Just curious cause I am curious could you split the whole thing in two? (Won’t be as much concrete) on the first truck or second but might skip the short hall fee?
2026-11-11 12:19:18
1
Christopher Crews :
Why not just put it back about ten feet passed the end of the lean to and just have a out door patio on the back of the work pad ?
2026-11-11 13:35:42
2
Fred Sanford :
I'd go thicker so you can put a lift in and make the pad smaller then call another truck later to finish it and that could be thinner where it won't be car driving on it and be more to just have a floor. who knows maybe at that point you will need a shed base too so the 8 yard does that spots that is left and a shed base
2026-11-11 16:29:36
0
John Is Rambling :
My toxic trait is I would probably buy a Mud Mixer and a bunch of bags to do it myself and feel absolutely bad after but convince myself I saved money somewhere in the long run if I ever have to pour a pad again 💀😂
2026-11-11 20:30:04
2
that05_2500👑 :
Yo I’m moving to Mississippi how do u like it there
2026-11-11 12:10:55
1
Cole train🥷🏻 :
just put your stone the whole way and finish the concrete later and put it on the back so it's not as much of an eyesore
2026-11-11 14:34:41
0
Max Mohr :
Order 16 yards. Then pour a bigger pad out front for washing or whatever
2026-11-11 15:25:50
2
Jake Ellis :
B&b concrete
2026-11-12 02:07:19
1
ah_kub_ram26 :
I would go outside the door and with a few feet of apron for 2 full trucks
2026-11-12 02:08:15
1
Ryan Romano :
Order 16 yards and pour out and around the front a bit.
2026-11-11 23:06:59
1
A_Dam_Goat :
If you do the 3.5 inches just make sure you make a an iron grid floor down it doesn’t matter the thickness just make sure you build one you can do it like a floor Joyce layout everything 16 or 24 inches and box it all off and it’ll never crack or fall apart
2026-11-14 20:58:52
0
freedomfredo :
get 16 yards and pour an external drive
2026-11-12 14:36:47
0
Jase Mf Harris :
do 8 yards then maybe do bags for the rest?
2026-11-13 05:27:03
0
To see more videos from user @ronosf, please go to the Tikwm
homepage.