@soyacincau369: Panas betul sekarang! 🥵❄️ Dapatkan Swiss Thomas Air Cooler 15L sekarang. Tangki besar tahan semalaman, angin kuat, bilik sejuk nyaman tanpa perlu pasang aircond mahal! 💨✨ #SwissThomas #AirCoolerMurah #RacunTikTok #GajetRumah #jombeli

soyacincau
soyacincau
Open In TikTok:
Region: MY
Thursday 03 September 2026 05:00:11 GMT
268
2
0
0

Music

Download

Comments

There are no more comments for this video.
To see more videos from user @soyacincau369, please go to the Tikwm homepage.

Other Videos

The Johor-Singapore RTS Link: The high-speed rail project connecting Singapore and Kuala Lumpur was once designed to drastically cut travel time between the two capitals. However, it was officially terminated in 2021 due to disagreements over operating frameworks and budget costs, with Malaysia paying the stipulated compensation fee. After the long-distance high-speed rail plan was shelved, Singapore and Malaysia shifted their focus to the busiest Johor Strait checkpoint and approved the Johor-Singapore RTS Link to address the urgent demand for short-distance cross-border commutes. At present, construction of the RTS is well underway, with over 90% of the works completed. Trains are undergoing regular trial runs, and the line is scheduled to open in January 2027. The ride from Woodlands North Station in Singapore to Johor Bahru will take merely five minutes, with integrated immigration clearance, which will greatly ease chronic congestion at the Johor-Singapore Causeway. This rail link will bring remarkable economic benefits. Massive daily commuter flows will boost tourism and consumption in Johor, attract millions more cross-border visits annually, and lift commercial and property values in Singapore’s northern Woodlands area. Facilitating smoother movement 新柔RTS地铁: 早年规划的新马吉隆坡—新加坡高铁,本打算大幅缩短两国首都通勤时长,却因双方运营模式、成本预算分歧,在2021年正式宣告终止,马来西亚也支付了相应违约金。远距离高铁项目搁置后,新马两国转而聚焦最繁忙的新柔关口,敲定新柔RTS跨境地铁项目,补齐两地短途通勤短板。 如今RTS建设稳步推进,整体工程进度超九成,列车已进入常态化测试阶段,预计2027年元旦通车,从新加坡兀兰北站到新山仅需五分钟,一地两检通关,极大缓解新柔长堤常年拥堵难题。 这条地铁落地后经济效益显著:海量通勤客流带动柔佛文旅、消费增长,每年新增千万级跨境出行人次,激活新加坡北部兀兰片区商业与房产价值;跨境人力往来更顺畅,助力新柔经济圈深度融合,稳固新马南部商贸、旅游与劳务往来,成为高铁项目落幕之后,两国经济联动的核心纽带。  #SGMY #RTSLink #SingaporeJohor #MalaysiaTravel #CrossBorderRail
The Johor-Singapore RTS Link: The high-speed rail project connecting Singapore and Kuala Lumpur was once designed to drastically cut travel time between the two capitals. However, it was officially terminated in 2021 due to disagreements over operating frameworks and budget costs, with Malaysia paying the stipulated compensation fee. After the long-distance high-speed rail plan was shelved, Singapore and Malaysia shifted their focus to the busiest Johor Strait checkpoint and approved the Johor-Singapore RTS Link to address the urgent demand for short-distance cross-border commutes. At present, construction of the RTS is well underway, with over 90% of the works completed. Trains are undergoing regular trial runs, and the line is scheduled to open in January 2027. The ride from Woodlands North Station in Singapore to Johor Bahru will take merely five minutes, with integrated immigration clearance, which will greatly ease chronic congestion at the Johor-Singapore Causeway. This rail link will bring remarkable economic benefits. Massive daily commuter flows will boost tourism and consumption in Johor, attract millions more cross-border visits annually, and lift commercial and property values in Singapore’s northern Woodlands area. Facilitating smoother movement 新柔RTS地铁: 早年规划的新马吉隆坡—新加坡高铁,本打算大幅缩短两国首都通勤时长,却因双方运营模式、成本预算分歧,在2021年正式宣告终止,马来西亚也支付了相应违约金。远距离高铁项目搁置后,新马两国转而聚焦最繁忙的新柔关口,敲定新柔RTS跨境地铁项目,补齐两地短途通勤短板。 如今RTS建设稳步推进,整体工程进度超九成,列车已进入常态化测试阶段,预计2027年元旦通车,从新加坡兀兰北站到新山仅需五分钟,一地两检通关,极大缓解新柔长堤常年拥堵难题。 这条地铁落地后经济效益显著:海量通勤客流带动柔佛文旅、消费增长,每年新增千万级跨境出行人次,激活新加坡北部兀兰片区商业与房产价值;跨境人力往来更顺畅,助力新柔经济圈深度融合,稳固新马南部商贸、旅游与劳务往来,成为高铁项目落幕之后,两国经济联动的核心纽带。 #SGMY #RTSLink #SingaporeJohor #MalaysiaTravel #CrossBorderRail

About